Sr.# |
PROJECT DESC |
VALUES |
CLIENT NAME |
CLIENT / CONTARCTOR NAME |
1 |
Frontal frame rehabilitation work |
MMG/Petro Rabigh |
Frontal frame rehabilitation work fixed using floating crane |
Frontal frame rehabilitation work fixed using floating crane |
2 |
Cargo handling in Dammam Port |
2,000,000.00 |
lssam Kabbani / Aramco Dammam |
Cargo handling works in Dammam Port with GSC |
3 |
Steel structure repair work |
Saudik Cont. Co. ltd. Dammam |
At berth. No.44, PCQ of King fahad Ind. Marring dolphin Catwalk platform and Handrail replacement wo |
At berth. No.44, PCQ of King fahad Ind. Marring dolphin Catwalk platform and Handrail replacement wo |
4 |
`M` Arch type rubber Fender replacement work |
79,000.00 |
Speetech/Government. Qurryath |
At berth No.25, BSQ of KFIP, five (5) nos of SM series Fender fixing work. Fenders Supplied by the c |
5 |
`M` Arch type rubber Fender replacement work |
Eastern Trading Co. AI Khobar |
Three (3) `M` Arch type rubber fender replaced |
Three (3) `M` Arch type rubber fender replaced |
6 |
On Board barge services |
50,000.00 |
Energy & Power Cont. Co.ltd. Al Khobar |
Lashing and unlashing work |
7 |
Ramp Pulley Block |
Electronic Electrical Industrial Co. |
Metal Block assembly for barge lifting & lowering. (for the fixed Ramp) |
Metal Block assembly for barge lifting & lowering. (for the fixed Ramp) |
8 |
Cargo discharger projects |
25,000.00 |
Abha Corporation Al Khobar |
Cutting, welding, lashing & unlashing work |